We recently completed a fully coordinated Stage 4 BIM modelling of an office building in London. This is a multi-story office building, comprising of meeting rooms, working spaces, hot desking areas and conference space.
BIM Outsourcing delivered complete MEP BIM model to RIBA stage 5. Team of Engineers produced spatially coordinated models of HVAC systems, Electrical systems, Plant room and Electrical room. Also produced detailed 2D drawings in PDF and DWG format. All COBie required parameters are made available and extension sheet is linked in the model.