
We recently completed a fully coordinated Stage 4 BIM modelling of an office building in London. This is a multi-story office building, comprising of meeting rooms, working spaces, hot desking areas and conference space.
BIM Outsourcing delivered complete MEP BIM model to RIBA stage 5. Team of Engineers produced spatially coordinated models of HVAC systems, Electrical systems, Plant room and Electrical room. Also produced detailed 2D drawings in PDF and DWG format. All COBie required parameters are made available and extension sheet is linked in the model.
What happens after you get in touch?

No pushy sales calls just a quick, helpful chat with our UK-based team to understand your project and see if we’re the right fit.
Watch Video
We recently completed a fully coordinated Stage 4 BIM modelling of an office building in London. This is a multi-story office building, comprising of meeting rooms, working spaces, hot desking areas and conference space.
BIM Outsourcing delivered complete MEP BIM model to RIBA stage 5. Team of Engineers produced spatially coordinated models of HVAC systems, Electrical systems, Plant room and Electrical room. Also produced detailed 2D drawings in PDF and DWG format. All COBie required parameters are made available and extension sheet is linked in the model.
30,000 m2, 3 storey data center in london
Location:London - England, UK
.avif)
tIER - 3 dATa CENTER IN eNGLAND uk
Location: England, UK
.avif)
ict cENTER eNGLAND
Location:England, UK
.avif)
AS-BUILT MODELLING OF DATA CENTER
Location:Stafford, England, UK
.avif)
What happens after you get in touch?

No pushy sales calls just a quick, helpful chat with our UK-based team to understand your project and see if we’re the right fit.
Watch Video














