We provided BIM model for the project which helped in visualizing the complete project before construction, and enabled comparison between different design options leading to development of more efficient, cost-effective and sustainable solution.
We generated a coordinated BIM model among all the trades (Architecture, Structure, Concrete, Mechanical, Electrical, Plumbing, Fire Protection, etc.). Clashes among services were by re-routing utilities, changing elevation and re-sizing. Value Engineering is also offered to improve system efficiency, reduce costs and easier construction and maintenance.
What happens after you get in touch?

No pushy sales calls just a quick, helpful chat with our UK-based team to understand your project and see if we’re the right fit.
Watch Video
We provided BIM model for the project which helped in visualizing the complete project before construction, and enabled comparison between different design options leading to development of more efficient, cost-effective and sustainable solution.
We generated a coordinated BIM model among all the trades (Architecture, Structure, Concrete, Mechanical, Electrical, Plumbing, Fire Protection, etc.). Clashes among services were by re-routing utilities, changing elevation and re-sizing. Value Engineering is also offered to improve system efficiency, reduce costs and easier construction and maintenance.
30,000 m2, 3 storey data center in london
Location:London - England, UK
.avif)
tIER - 3 dATa CENTER IN eNGLAND uk
Location: England, UK
.avif)
ict cENTER eNGLAND
Location:England, UK
.avif)
AS-BUILT MODELLING OF DATA CENTER
Location:Stafford, England, UK
.avif)